Eclairion & EDF: two future AI Factory sites in Moselle

Eclairion & EDF: two future AI Factory sites in Moselle

SECURITY
SOVEREIGNTY

A major milestone is reached today with the signing of the construction lease promise with EDF for our two future sites in Moselle (Richemont and La Maxe). Eclairion is delighted to finalise the expression of interest process launched by EDF for the conversion of these two former production sites. This signing constitutes a structuring step for the sovereignty of AI Factory infrastructure in France and for the implementation of our industrial platform. We also wish to salute the commitment and quality of collaboration of the EDF and Eclairion teams, as well as the decisive support of local authorities and RTE, mobilised over recent months to successfully reach this first milestone.

No items found.

You can also read

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua.

All our news

Choose France: Eclairion, the French supercomputer hosting center, will invest 2.5 billion euros in France over four years.

This announcement comes as a 100% French edition of the Choose France summit opens Monday in Paris, with over 150 invited groups. "More than 30 billion euros in French investment" will be announced there, according to Bercy.

Lire la suite
SOVEREIGNTY

Environmental impact was a key factor

EDF once again chooses Eclairion to build a data center on a former site near Lyon

Lire la suite
SUSTAINABILITY

An AI Factory that creates value for its territory

An AI Factory can be a territorial asset, not just a technical site. By establishing on industrial brownfields and valorising waste heat, it contributes to local rehabilitation and transition.

Lire la suite
SOVEREIGNTY

Direct Liquid Cooling: the key to high-density GPU clusters

As computing density increases, air cooling quickly reaches its limits. Direct Liquid Cooling provides a concrete response to the thermal needs of high-performance AI infrastructures.

Lire la suite
SUSTAINABILITY

Digital sovereignty starts from the physical layer

Digital sovereignty is not limited to data or software. It also starts with control of the physical infrastructure, its location, its applicable law and its legal dependencies.

Lire la suite
SOVEREIGNTY

The AI Factory as physical infrastructure, not just a datacenter

Before talking about artificial intelligence, we need to talk about infrastructure. An AI Factory rests first on a physical base capable of absorbing very high GPU loads, without compromise on space, power and cooling.